Industrialist Ratul Puri, Chairman Hindustan Power, Champions Battery Energy Storage for India

Written by Mohan Kumar | Jun 23, 2025 10:32:44 AM

India’s journey towards a sustainable and self-reliant energy future is gaining momentum, driven by ambitious policy goals and an urgent need to reduce carbon emissions. But there’s one missing piece in this green puzzle — the ability to store renewable energy effectively. Enter Battery Energy Storage Systems (BESS), a revolutionary solution for balancing supply and demand, and at the helm of this transformation is Industrialist Ratul Puri, Chairman of Hindustan Power.

 

Ratul Puri is not just promoting renewable energy; he is championing the battery energy storage movement, ensuring India has the infrastructure needed to make renewables reliable and efficient. This blog explores his vision, impact, and the national significance of his leadership.

The Need for Battery Storage in India’s Energy Ecosystem

India is projected to add over 500 GW of non-fossil energy capacity by 2030. With solar and wind power being inherently intermittent, a stable and scalable battery storage network is essential.

Why Battery Storage Matters:

  • Enables round-the-clock (RTC) clean power

  • Helps stabilize the grid during peak and off-peak hours

  • Reduces reliance on fossil fuel-based backup systems

  • Powers remote and underserved regions reliably

Without storage, renewable power cannot fulfill its potential. BESS acts as the bridge between generation and consumption, a bridge that Ratul Puri is actively building.

Who Is Ratul Puri? A Visionary Industrialist

Ratul Puri, a globally recognized Indian business leader, is the Chairman of Hindustan Powerprojects Pvt. Ltd. He has built a reputation for identifying emerging trends and aligning them with national interest.

Highlights of His Profile:

  • Former Young Global Leader by the World Economic Forum

  • Key figure in India’s early push for solar energy

  • Led Hindustan Power’s foray into global energy markets

  • Advocates clean tech, innovation, and sustainability

Ratul Puri has always believed in creating scalable, future-ready infrastructure — and BESS is the next logical step in that journey.

The Game-Changing 120 MWh Battery Energy Storage Project

In a significant milestone, Hindustan Power was awarded the LOI (Letter of Intent) for a 120 MWh battery storage project, one of the largest private-sector storage projects in India to date.

Project Details:

  • Location: Renewable-rich zone with high demand volatility

  • Technology: Lithium-ion battery with intelligent control systems

  • Capacity: 120 MWh of dispatchable power

  • Purpose: Peak load management, renewable integration, grid backup

This project showcases the shift from pure energy generation to grid-enabling infrastructure, marking a strategic evolution for Hindustan Power.

“Storage is not optional anymore. It’s fundamental to our energy future.” – Ratul Puri

How Ratul Puri Is Reimagining India’s Energy Infrastructure

Ratul Puri’s approach to BESS is not just operational — it’s strategic, policy-driven, and socially inclusive.

1. Scaling Storage Nationally

Puri envisions battery storage systems across urban and rural areas to make power reliable, clean, and affordable for all. Hindustan Power is developing a multi-year roadmap to deploy over 1 GWh of storage by 2030.

2. Tech-Driven Innovation

The company invests in advanced battery management systems (BMS), AI-based forecasting tools, and hybrid energy solutions. This ensures battery longevity, grid responsiveness, and real-time decision-making.

3. Collaborative Ecosystems

Puri is building partnerships with global tech firms and Indian research institutes to accelerate storage deployment and local manufacturing.

4. Policy and Regulatory Advocacy

Ratul Puri is actively engaging with government bodies like CEA, MNRE, and NITI Aayog to:

  • Push for storage-specific revenue models

  • Advocate for battery incentive schemes

  • Help define grid-level storage policy frameworks

BESS: Key to India’s Renewable Energy Future

India’s ambitious green transition hinges on its ability to manage energy efficiently. Battery storage is no longer an add-on; it is core infrastructure.

Advantages of BESS:

  • Fast response to demand surges

  • Integrates with solar and wind systems

  • Lowers cost of peaker plants

  • Supports microgrids and decentralized energy

With Ratul Puri leading the charge, Hindustan Power is ensuring India’s transition to RTC renewables is both feasible and cost-effective.

Empowering Rural India with Battery + Solar Solutions

A major component of Ratul Puri’s vision is to bridge the energy access gap in rural and semi-urban India using solar plus storage microgrids.

Key Initiatives:

  • BESS-supported village electrification projects

  • Solar-run schools and health centers

  • Community charging stations for EVs

These initiatives help improve education, healthcare, and local economies. It’s a fusion of impact and infrastructure.

Challenges in BESS Deployment — And Puri’s Solutions

Implementing large-scale battery storage in India presents challenges, but Ratul Puri’s roadmap addresses each systematically.

Common Challenges:

  • High capital expenditure

  • Supply chain dependency

  • Recycling and battery waste management

  • Technical grid integration

Hindustan Power’s Response:

  • Exploring public-private partnerships for funding

  • Supporting Make in India for battery cell manufacturing

  • Partnering with e-waste recyclers and safety agencies

  • Deploying storage pilots with DISCOMs and regulators

“We’re not just solving a tech problem. We’re building a national solution.” – Ratul Puri

Building India’s Storage Ecosystem from the Ground Up

Puri is not just creating projects. He’s nurturing an entire ecosystem — from R&D and manufacturing to logistics and workforce.

Focus Areas:

  • Skill Development: Training youth for BESS installation and maintenance

  • Innovation Labs: Establishing storage R&D clusters

  • Supply Chain: Building local sourcing networks for components

These investments have long-term multiplier effects, positioning India as a global hub for energy storage solutions.

Recognition and Global Positioning

Ratul Puri’s pioneering work in battery energy storage has not gone unnoticed. He’s earned national and international recognition:

  • Featured in IEA and WEF panels on clean tech and grid modernization

  • Hindustan Power selected as a pilot partner by global clean energy think tanks

  • Invited speaker at COP summits and G20 energy forums

These platforms amplify his message and bring global best practices to Indian soil.

The Hindustan Power Advantage Under Puri

What makes Hindustan Power stand out in the energy storage space?

  • Visionary Leadership: Early adoption of future-focused technology

  • Technical Prowess: In-house EPC, O&M, and storage expertise

  • Impact Focus: Powering change, not just megawatts

  • ESG Alignment: Environmental and social value embedded in every project

Together, these elements ensure long-term sustainability, scalability, and social good.

The Road Ahead: 2030 and Beyond

Ratul Puri’s roadmap for battery energy storage is deeply aligned with India’s clean energy ambitions.

Next Steps:

  • Scale storage projects to 1 GWh+ across 10 states

  • Establish battery tech parks in partnership with Indian states

  • Develop urban battery hubs for smart cities

  • Lead dialogue on green hydrogen + battery hybrid models

The long-term goal? Make India energy independent through technology-driven solutions.

Conclusion: Building India’s Energy Backbone One Battery at a Time

As India races toward a low-carbon future, energy storage will define the reliability, stability, and scalability of our green grid. In this national mission, Industrialist Ratul Puri, Chairman Hindustan Power, is emerging as a visionary leader and system architect.

Through bold investments, inclusive solutions, and relentless innovation, he is not just adapting to change — he is driving it. Battery energy storage is India’s next big leap, and Ratul Puri is already at the finish line, ready to bring the country with him.

“Powering a billion dreams requires more than energy. It requires vision, courage, and infrastructure that lasts generations.” – Ratul Puri